Language
	
	Asturianu (ast) 
	Català (ca) 
	Čeština (cs) 
	Dansk (da) 
	Deutsch (de) 
	
	English [US] (en-US) 
	Español (es) 
	Esperanto (eo) 
	Eesti keel (et) 
	Euskara (eu) 
	Français (fr) 
	Gàidhlig (gd) 
	Galego (gl) 
	Italiano (it) 
	Lietuvių (lt) 
	Magyar (hu) 
	Nederlands (nl) 
	Norsk (no) 
	Polski (pl) 
	Português [do Brasil] (pt-BR) 
	Português [Europeu] (pt) 
	Română (ro) 
	Slovenčina (sk) 
	Slovenščina (sl) 
	Suomi (fi) 
	Svenska (sv) 
	Yкраїнська (uk) 
	Tiếng Việt (vi) 
	Türkçe (tr) 
	ኦሮሚኛ (om) 
	Հայերեն (hy) 
	Ελληνικά (el) 
	български език (bg) 
	Русский (ru) 
	Cрпски [ћирилицом] (sr) 
	
	עברית (he) 
	हिन्दी (hi) 
	ភាសាខ្មែរ (km) 
	தமிழ் (ta) 
	ภาษาไทย (th) 
	简体中文 (zh-CN) 
	正體中文 (zh-TW) 
	日本語 (ja) 
	한국어 (ko) 
	 
	
  
  
    
     The Free and Open Productivity Suite
   
      
      
  
 
 
Methods' Summary 
 
start  
initialize and start the progress
   
 
end  
stop the progress
   
 
setText  
update progress description
   
 
setValue  
update progress value
   
 
reset  
clear progress value and description
   
 
Methods' Details 
 
start 
[oneway] void 
 
start ( 
[in] string 
 Text, 
 
[in] long 
 Range ); 
 
 
Description  
initialize and start the progress
  
 It activates a new created or reactivate an already used inidicator
 (must be finished by calling XStatusIndicator ::end() 
 before!). By the way it's possible to set first progress description
 and the possible range of progress value. That means that a progress
 can runs from 0 to Range .
 
  
Parameter Text  
initial value for progress description for showing
 Value can be updated by calling XStatusIndicator ::setText() .
  
Parameter Range  
mewns the maximum value of the progress which can be setted by
 calling XStatusIndicator ::setValue() .
  
 
 
 
 
 
end 
 
 
setText 
[oneway] void 
 
setText ( 
[in] string 
 Text ); 
 
 
Description  
update progress description
  
 Initial value can be set during starting of the progress by calling
 XStatusIndicator ::start() .
 Stopped indicators must ignore this call.
 
  
Parameter Text  
new value for progress description which should be shown now
  
 
 
 
 
 
setValue 
[oneway] void 
 
setValue ( 
[in] long 
 Value ); 
 
 
Description  
update progress value
  
 Wrong values must be ignored and stopped indicators must ignore this
 call generaly.
 
  
Parameter Value  
new value for progress which should be shown now
 Must fit the range [0..Range] which was set during
 XStatusIndicator ::start() .
  
 
 
 
 
 
reset 
 
Description  
clear progress value and description
  
 Calling of setValue(0) and setText("") should do the same.
 Stopped indicators must ignore this call.
 
  
 
 
 
 
 
Top of Page Copyright © 2013, The Apache Software Foundation, Licensed under the Apache License, Version 2.0. Apache, the Apache feather logo, Apache OpenOffice and OpenOffice.org are trademarks of The Apache Software Foundation. Other names may be trademarks of their respective owners.